top of page

Glow-Worm Ultimate 3 35kW Gas Combi Boiler ErP & Horizontal Flue with Filter Pack

 

Overview

 

Inclusive of all labour and Parts 

 

The Ultimate3 is Glow-worm's high performance, ErP A rated boiler range developed for the one off installer market, and exclusively manufactured for City Plumbing Supplies. The Ultimate 3 combi offers both high DHW flow rates and flexible flue options. The high performance model also features a modulating Grundfos pump for reduced energy use, a manual pressure gauge for easy installation and a modern, bright, LCD display with a simple-to-use interface. Designed using an automotive grade, aluminium heat exchanger, the Ultimate 3 offers proven reliability and performance whilst being light to install and also easy to maintain. This boiler pack comes with an Adey MagnaClean Filter and horizontal flue.

 

  • Modern, bright, LCD display with easy-to-use interface
  • High quality, automotive grade, aluminium heat exchanger providing excellent performance
  • ErP A rated for efficiency - helping to reduce energy bills
  • Modulating Grundfos pump for reduced energy use
  • Manual pressure gauge to make installation easy
  • Uses familiar Glow-worm diagnostics for easy install & servicing
  • Inbuilt filling loop for straightforward maintenance
  • Compatible with full range of Glow-worm controls, flues and accessories
  • Ideal for use with innovative MiGo app based control

 

Technical 

 

ERP Efficiency94%
ERP RatingA
Boiler TypeCombi
Depth300 mm
Height740 mm
Width418 mm
Maximum Horizontal Flue 100mm9 m
Maximum Horizontal Flue 125mm25 m
Maximum Vertical Flue 100mm9 m
Maximum Vertical Flue 125mm25 m
External or InternalInternal
DHW Output35.7 kW
DHW Flow Rate at 35 Degree Rise14.4 l/min
DHW Output Min and Max7.1/35.7 kW
SEDBUK SAP 2009 Rating0.892
SEDBUK SAP 2005 Rating0.909
CH Condensing Max Output31.8 kW
Heat Output35 kW
Fuel TypeNatural Gas
IncludesHorizontal Flue, Filter
Noise Level52 dB
Nox Class5
Solar CompatibleN
TypeBoiler Pack
Years Guaranteed2
Registered with the Energy Savings TrustY
Made To OrderN
Manufacturer Model No10021405
Brand NameGlow-Worm
Range DescriptionUltimate 3

 

Glow-Worm Ultimate 3 35kW Gas Combi Boiler ErP

£2,197.31Price

Existing Boiler

Disconnect the existing boiler and remove from site.

 

New Boiler

Supply and install new boiler in same location as existing

 

• Water treatment inhibitor

• Gas Safe and Building Control Certificate.

• Commissioning new boiler

• Copper Pipes and miscellaneous materials

• Filling loop

• Horizontal Flue.

• Removal of old boiler.

• Warranty on boiler (Manufacturers T&C's apply)

 

Condensate pipe

The condensate pipe will be connected into a soak-away or into the existing rain water/ fowl sewer drainage system

 

Room Stat

To meet the current building regulations, we will include in our estimate for installing the following modern controls

 

• Wireless room thermoset

 

A new balanced horizontal flue will be fitted from the boiler through the wall/roof and terminated externally.

 

Electrical works

Allowance has been made for wiring the controls on the boiler and to the controls mentioned above.

 

The mains supply to the boiler and controls will be taken from an adjacent point with all wiring hidden where possible, otherwise run on the surface of adjacent walls

 

No allowance has a been made for service cross bonding which may be required in the house. If this is not present our electrician will advise you.

 

Gas Service

The gas service will be taken from the existing 22mm supply and connected to the control valve on the boiler.

 

System Clean

To meet the current building regulations and conditions of the boilers warranty the heating system needs to be flushed out in accordance to BS7593.

 

This is because the heat exchangers in the new boiler are a lot smaller and can be prone to damage from sediment from radiators.

 

To ensure we remove as much sediment from the sytem as possible we ude a power flushing machine with the aid of Frenox cleaner.

 

This is a long process as each radiator is separately power flushed until the water running through the cleaner is clean.

 

To improve the process, we also agitate the sediment by quickly altering the direction of water flowing through the system and use a rubber mallets or mechanical agitator or magnetic roller on the radiators.

On completion of the works the use of the controls will be demonstrated and a handover pack will be issued with all relevant documentation require to sustained a health system

 

Testing and Commissioning

On completion of the works the use of the controls will be demonstrated and a handover pack will be issued with all relevant documentation require to sustained a health system

 

Handover

On completion of the works the use of the controls will be demonstrated and a handover pack will be issued with all relevant documentation require to sustained a health system

 

Protection

Throughout the duration of the works we will install full carpet/flooring protection to all works areas and access routes with the addition on dust sheets where appropriate.

 

All works areas will be left clean and tidy upon each day’s work and we will endeavour to keep dust levels to a minimum throughout

bottom of page