top of page

Heatline Capriz 2 28kW Gas Combi Boiler ErP & Horizontal Flue Pack

 

Overview

 

Inclusive of all labour and Parts 

 

The Heatline Capriz2 is a high efficiency condensing combination boiler and comes fitted with a 24 hour easy-to-use analogue timer. The Heatline Capriz2 is an ERP A rated boiler and achieves a SEDBUK 2009 efficiency rating of 89.3%. This lightweight easy-to-install boiler is an excellent choice for those requiring a no-nonsense, value for money combi solution. This boiler pack includes the boiler and horizontal flue kit for more convenience and better value.

 

  • ErP A rated boiler
  • Modern bright LCD display
  • Improved visual design
  • Modern design to match most interior design and kitchen schemes
  • Designed to last longer, easy to maintain, ultra quiet and reduces customers’ energy bills
  • Comes with Heatline Capriz Horizontal Flue
  • 2 Year Warranty
  •  

Technical 

 

ERP Efficiency93%
ERP RatingA
Boiler TypeCombi
Depth300 mm
Height740 mm
Width418 mm
Maximum Horizontal Flue 100mm10
Maximum Horizontal Flue 125mm9
Maximum Vertical Flue 100mm10
Maximum Vertical Flue 125mm25
External or InternalInternal
DHW Output28
DHW Response 1m from Tap5 secs
DHW Flow Rate at 35 Degree Rise11.4
SEDBUK SAP 2009 Rating89.3
SEDBUK SAP 2005 Rating90.1
CH Condensing Max Output25.7
Heat Output24.7 kW
Fuel TypeNatural Gas
IncludesHorizontal Flue
Noise Level51
Nox Class5
Solar CompatibleNo
TypeBoiler Pack
Years Guaranteed2
Registered with the Energy Savings TrustYes
Made To OrderN
Manufacturer Model No215478MCP
Country OriginGB
Brand NameHeatline
Range DescriptionCapriz4

Heatline Capriz 2 28kW Gas Combi Boiler

£1,834.25Price

Existing Boiler

Disconnect the existing boiler and remove from site.

 

New Boiler

Supply and install new boiler in same location as existing

 

• Water treatment inhibitor

• Gas Safe and Building Control Certificate.

• Commissioning new boiler

• Copper Pipes and miscellaneous materials

• Filling loop

• Horizontal Flue.

• Removal of old boiler.

• Warranty on boiler (Manufacturers T&C's apply)

 

Condensate pipe

The condensate pipe will be connected into a soak-away or into the existing rain water/ fowl sewer drainage system

 

Room Stat

To meet the current building regulations, we will include in our estimate for installing the following modern controls

 

• Wireless room thermoset

 

A new balanced horizontal flue will be fitted from the boiler through the wall/roof and terminated externally.

 

Electrical works

Allowance has been made for wiring the controls on the boiler and to the controls mentioned above.

 

The mains supply to the boiler and controls will be taken from an adjacent point with all wiring hidden where possible, otherwise run on the surface of adjacent walls

 

No allowance has a been made for service cross bonding which may be required in the house. If this is not present our electrician will advise you.

 

Gas Service

The gas service will be taken from the existing 22mm supply and connected to the control valve on the boiler.

 

System Clean

To meet the current building regulations and conditions of the boilers warranty the heating system needs to be flushed out in accordance to BS7593.

 

This is because the heat exchangers in the new boiler are a lot smaller and can be prone to damage from sediment from radiators.

 

To ensure we remove as much sediment from the sytem as possible we ude a power flushing machine with the aid of Frenox cleaner.

 

This is a long process as each radiator is separately power flushed until the water running through the cleaner is clean.

 

To improve the process, we also agitate the sediment by quickly altering the direction of water flowing through the system and use a rubber mallets or mechanical agitator or magnetic roller on the radiators.

On completion of the works the use of the controls will be demonstrated and a handover pack will be issued with all relevant documentation require to sustained a health system

 

Testing and Commissioning

On completion of the works the use of the controls will be demonstrated and a handover pack will be issued with all relevant documentation require to sustained a health system

 

Handover

On completion of the works the use of the controls will be demonstrated and a handover pack will be issued with all relevant documentation require to sustained a health system

 

Protection

Throughout the duration of the works we will install full carpet/flooring protection to all works areas and access routes with the addition on dust sheets where appropriate.

 

All works areas will be left clean and tidy upon each day’s work and we will endeavour to keep dust levels to a minimum throughout

bottom of page